Newark, New Jersey · Building since 2016 General contractor · Construction manager · Design-builder CareersNewsroomPrequalifyProject map
Buildings · Commercial

Workplaces that work on day one.

Lab and office buildings, corporate headquarters, core and shell and tenant improvements, with the AV, networks and security systems built by the same team that builds the structure.

What owners need from us.

01

Move-in dates are fixed

Leases end, teams relocate and the first all-hands is on the calendar. Every week of delay costs the owner rent and its people time.

02

Technology is the workplace

Conference rooms, Wi-Fi, badge readers and cameras are what employees touch every day. When a separate vendor arrives after the ceilings close, the building waits. We build them on the same schedule.

03

Plans change mid-build

Departments grow, floors lease and layouts move while the structure rises. Base building and fit-out have to be sequenced so neither waits on the other.

Commercial

What we build.

  1. 01

    Lab and office buildings

    Speculative and owner-occupied buildings with heavy floor loads, vibration-controlled bays and shafts sized for research tenants.

  2. 02

    Headquarters and core and shell

    Corporate offices and core and shell buildings with base systems sized for future loads.

  3. 03

    Tenant improvements

    Workplace fit-outs on occupied floors, phased around the people already working there.

  4. 04

    Workplace technology

    AV, structured cabling, Wi-Fi, access control and video surveillance designed, installed and commissioned with the building.

How we deliver here.

The capabilities owners in this market rely on most.

Preconstruction & EstimatingPlan

Early budgets that price structure, interiors and technology together, so nothing shows up later as a surprise.

General ContractingDeliver

One contract for structure, interiors and technology, so there is one schedule and one team to call.

Virtual Design & ConstructionPlan

Risers, ceiling plenums, cable tray and AV backing coordinated in the model before rough-in.

Building SystemsBuild

AV, networks, access control and building controls commissioned together before move-in.

In practice · Life Sciences Lab & Office Building

Ready for any tenant’s research.

The life sciences lab and office building was delivered under one general contract before a single tenant had signed. Heavy floor loads and vibration-controlled bays went into the structure, and the shaft plan left room for any tenant’s exhaust, process piping and power. Our team built the structured cabling, networks, access control and building controls with the shell, so each floor turned over ready for lab fit-out instead of waiting on a second contractor.

265,000
Square feet
General contracting
Delivery
2023
Completed

Questions owners ask us.

Can you start tenant work before the core and shell is finished?

Yes. We sequence base building and fit-out so floors turn over to tenant crews as soon as they are dried in and conditioned.

Do you install AV, cabling and security systems yourselves?

Yes. Our team builds and commissions AV, structured cabling, networks and access control alongside the structure, so there is no hand-off to a separate vendor after the ceilings close.

Do you renovate floors in occupied office buildings?

We do. Noisy work runs after hours, elevators are reserved for deliveries on a schedule, and tenants get notice before every shutdown.

Commercial

Planning a commercial project?

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.