Newark, New Jersey · Building since 2016 General contractor · Construction manager · Design-builder CareersNewsroomPrequalifyProject map
Higher Education · 2023

Health Sciences & Nursing Building

A nursing school where the training wards look, sound and work like the hospital floors students will join.

Owner
Confidential
Location
U.S.
Market
Higher Education
Delivery
Design-build
Scale
148,000 SF
Completed
2023
The brief

Simulation hospital wards, anatomy labs and a four-story learning atrium, built so nursing students train in rooms that work like the real thing.

Simulation only teaches if it feels real. The 148,000-square-foot building needed working hospital headwalls with medical gas outlets, patient simulators, control rooms with one-way glass and a camera and recording system that lets faculty replay every scenario. Anatomy labs needed their own exhaust and finishes. All of it had to open for a fall semester, through a design-build contract that set the budget before the drawings were finished.

How we built it

The approach.

  1. 01

    Faculty in the room early

    Nursing faculty walked a mockup simulation room, set headwall heights and camera views, and signed off on the layout before the floors were drawn in detail.

  2. 02

    Labs coordinated in the model

    Exhaust, medical gas, plumbing and data in the anatomy and sim labs were coordinated in the model, with sleeves and backing placed before the decks were poured.

  3. 03

    Recording and AV built in

    Debrief rooms, scenario cameras, microphones and the recording platform were installed and tested by our own systems team as part of the building contract.

  4. 04

    The atrium went up early

    The four-story atrium steel and glazing were sequenced ahead of interiors, so the building was dried in before the weather turned.

The outcome.

148,000Square feet
1Design-build contract
100%Sim rooms tested with faculty scenarios
On dateOpen for the fall semester

“Before handover we ran a full scenario, simulator, cameras and all. If the replay did not work, the room was not finished.”

Technology systems manager, Tum Harry
Higher Education

Planning something like this?

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.