Newark, New Jersey · Building since 2016 General contractor · Construction manager · Design-builder CareersNewsroomPrequalifyProject map
Sports & Entertainment · 2022

Collegiate Aquatics Center

A 50-meter pool, a diving well and 1,800 seats, with air and water clear enough to race in.

Owner
Confidential
Location
U.S.
Market
Sports & Entertainment
Delivery
Design-build
Scale
1,800 seats
Completed
2022
The brief

A 50-meter competition pool, a diving well and an 1,800-seat natatorium, with air and water systems tuned for championship meets.

A natatorium is a building at war with its own air. Warm, chlorinated, humid air attacks steel, glass and ductwork, and a pool that is a few millimeters short or uneven cannot host a sanctioned meet. The design-build team had to deliver a competition pool, a diving well with platforms and an 1,800-seat bowl, with dehumidification, water treatment, timing systems and scoreboards tuned before the first championship.

How we built it

The approach.

  1. 01

    Built to resist the air

    Coatings, vapor barriers and stainless fasteners were specified for the pool hall, and the envelope was tested for air leaks before the ceiling closed.

  2. 02

    Lanes measured to the millimeter

    The pool shell was surveyed after concrete, after tile and after filling, so every lane met competition length.

  3. 03

    Air and water tuned together

    Dehumidification, pool heating and water treatment were commissioned as one system and run for weeks before the first meet.

  4. 04

    Timing and boards in the contract

    Touchpads, timing consoles, scoreboards, sound and the venue network were installed and tested by our own systems team.

The outcome.

1,800Seats
50 mCompetition pool
100%Lanes surveyed to length
On dateFirst home meet

“Swimmers notice everything, the water, the air, the clock. We tuned all three before the first race.”

Superintendent, Tum Harry
Sports & Entertainment

Planning something like this?

Share the project, the site and the date that matters. A senior builder will come back to you within one business day.